Intake Photos - March 2011

Carpenters Building Concrete Forms for Intake Wet Well Walls Delivery of Quarry Stone for Waterside Fill Driving Steel Upper Pipe Piles for Discharge Piping Supports Excavating Slopes around Intake Cell with Long Reach Excavator Laborers Sealing Temporary Cofferdam Sheet Pile Joints Mass Excavation of the Intake Cell with Clam Bucket Piledrivers Switching the Rigging on the Crawler Crane Placing Waterside Fill with Long Reach Excavator Steel Roadway and Upper Pipe Pile Installation is Complete